The engine was removed from the chassis on 4 March, along with the rear suspension, drivetrain, electrical system and Kinetic suspension system. Engine-out is a relatively straight-forward procedure, and will allow closer inspection of subsystems. Any minor repairs will be conducted on the subsystems and then the car can be reassembled.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment